Data Centre, Network & POP Maintenance Notice – Saturday evening June 29th/30th 2019

During the evening of Saturday, June 29th from 9pm that night (through to 9am on Sunday) we will be performing upgrades to selected hosting server platforms of Network Presence in Sydney, Australia.

Customers with services (VPS) on the hosting platforms to be upgraded may be emailed advisory notices, and this is a general notice related to other ancillary upgrades and Infrastructure Maintenance being performed during this scheduled window of time.

This Maintenance Window starts from 9pm Sydney time on the evening of Saturday, June 29th 2019 through to 9am on Sunday, and I’ll be personally contactable by phone & online during and after these works in-case there’s any issues that arise.
During this Maintenance Window, selected network or server equipment will be worked on, upgraded and restarted. Works will be completed as quickly as possible (and where possible, timing information will be in emails to affected customers) and restarts are short service interruptions only, while upgrades may incur longer service interruptions.

This will incur outages to selected hosting services of Network Presence in Australia during this off-peak scheduled works period.
In addition, there may be some impact (short 5-10 minute periods) to the general Internet Connectivity of portions of Network Presence in Sydney during these works, though redundant routing will be utilised during these works. Our Adelaide POP is unaffected by this Maintenance Notice and works.

Progress updates during the works will be posted to our Operations Twitter Feed at https://twitter.com/netpresops

FYI and regards,
Richard.

Posted in Sales | Comments Off on Data Centre, Network & POP Maintenance Notice – Saturday evening June 29th/30th 2019

Node 6 SSD Disk Array Failure – June 9th 2019

On Sunday June 9th 2019 a single SSD drive in a multi-drive mirrored disk array entered an error state and we were notified of that. Being in the Data Centre at the time, we accessed spare drives there and shutdown Node 6 and replaced that single failed drive. When Node 6 came back online however, all drives in its local SSD array were not powering up.

In short, though only 1 disk errored in a way that was visible to us, all its drives had failed and would not power back up.

This has resulted in all SSD based disk data on Node 6 to be irrecoverably lost.

As Node 6 was one of our older VPS Hosting Platforms, it didn’t have a lot of customers on it and we’re now emailing all customers that had services on Node 6 to advise of the loss of their VPS data and present them with options, which include of course our SLA based refund of 25% of their monthly fees for the current month.

Customers who had made use of our VPS Management Backup service (available to all customers) have already been restored to other Nodes and were back online on the day of the disk array and Node 6 failure, however unfortunately most customers on Node 6 had not made use our freely available VPS Backup/Restore capability.

If you are an affected customer on Node 6, please reply to our email to you to followup on options available.

We’re terribly sorry for this data loss event and we will be changing our maintenance programs for these older VPS Hosting Plattforms as we proceed with this year’s major platform update procedure and for when a single disk error is found in a multi-disk array.

FYI and regards,

Richard.

Posted in Sales | Comments Off on Node 6 SSD Disk Array Failure – June 9th 2019

Data Centre, Network & POP Maintenance Notice – Fri evening through to Sunday, June 7th/9th 2019

During the evening of Friday, June 7th from 9pm that night (through to 6pm on Sunday) we will be performing upgrades to selected hosting server platforms of Network Presence in Sydney, Australia.

Customers with services (VPS) on the hosting platforms to be upgraded may be emailed advisory notices, and this is a general notice related to other ancillary upgrades and Infrastructure Maintenance being performed during this scheduled window of time.

This Maintenance Window starts from 9pm Sydney time on the evening of Friday, June 7th 2019 through to 6pm on Sunday, and I’ll be personally contactable by phone & online during and after these works in-case there’s any issues that arise.
During this Maintenance Window, selected network or server equipment will be worked on, upgraded and restarted. Works will be completed as quickly as possible (and where possible, timing information will be in emails to affected customers) and restarts are short service interruptions only, while upgrades may incur longer service interruptions.

This will incur outages to selected hosting services of Network Presence in Australia during this off-peak scheduled works period.
In addition, there may be some impact (short 5-10 minute periods) to the general Internet Connectivity of portions of Network Presence in Sydney during these works, though redundant routing will be utilised during these works. Our Adelaide POP is unaffected by this Maintenance Notice and works.

Progress updates during the works will be posted to our Operations Twitter Feed at https://twitter.com/netpresops

FYI and regards,
Richard.

Posted in Sales | Comments Off on Data Centre, Network & POP Maintenance Notice – Fri evening through to Sunday, June 7th/9th 2019

Update on 2019 VPS Platform Refresh

The upgrades this year to our various VPS Hosting Nodes (first mentioned at http://blog.networkpresence.co/?p=8952 ) is going well and gets a boost in June to August with a number of new and faster VPS Nodes coming online in the coming months, as some of our older Nodes geta a well earned retirement.

This has already happened to over 75% of the Node at our Adelaide POP and 20% of the Nodes in our main Sydney POP, and it’s now time for more new Nodes to come online in Sydney.

To action this we have some Data Centre Scheduled Maintenance works coming up in Sydney in June and through July and August and we’ll post the usual notices of them here as they are scheduled. Impacted customers will be emailed individually as well to notify them in advance of these upgrades to their relevant VPS Nodes.

We’re excited by these upgrades which already have shown to yield excellent performance increases for relevant customers on the newer Nodes and the general VPS client base in Sydney will see more of these faster Nodes in the coming months now.

Regards,
Richard.

Posted in Sales | Comments Off on Update on 2019 VPS Platform Refresh

Data Centre, Network & POP Maintenance Notice – Thu evening & Friday, March 21st/22nd 2019

During the evening of Thursday, March 21st from 9pm that night (through to 6am on Friday) we will be performing upgrades to selected hosting server platforms of Network Presence in Sydney, Australia.

Customers with services (VPS) on the hosting platforms to be upgraded may be emailed advisory notices, and this is a general notice related to other ancillary upgrades and Infrastructure Maintenance being performed during this scheduled window of time.

This Maintenance Window starts from 9pm Sydney time on the evening of Thursday, March 21st 2019 through to 6am on Friday, and I’ll be personally contactable by phone & online during and after these works in-case there’s any issues that arise.
During this Maintenance Window, selected network or server equipment will be worked on, upgraded and restarted. Works will be completed as quickly as possible (and where possible, timing information will be in emails to affected customers) and restarts are short service interruptions only, while upgrades may incur longer service interruptions.

This will incur outages to selected hosting services of Network Presence in Australia during this off-peak scheduled works period.
In addition, there may be some impact (short 5-10 minute periods) to the general Internet Connectivity of portions of Network Presence in Sydney during these works, though redundant routing will be utilised during these works. Our Adelaide POP is unaffected by this Maintenance Notice and works.

Progress updates during the works will be posted to our Operations Twitter Feed at https://twitter.com/netpresops

FYI and regards,
Richard.

Posted in Sales | Comments Off on Data Centre, Network & POP Maintenance Notice – Thu evening & Friday, March 21st/22nd 2019

Data Centre, Network & POP Maintenance Notice – Sat evening & Sunday, March 9th/10th 2019

During the evening of Saturday, March 9th from 9pm that night (through to 6pm on Sunday) we will be performing upgrades to selected hosting server platforms of Network Presence in Sydney, Australia.

Customers with services (VPS) on the hosting platforms to be upgraded may be emailed advisory notices, and this is a general notice related to other ancillary upgrades and Infrastructure Maintenance being performed during this scheduled window of time.

This Maintenance Window starts from 9pm Sydney time on the evening of Saturday, March 9th 2019 through to 6pm on Sunday, and I’ll be personally contactable by phone & online during and after these works in-case there’s any issues that arise.
During this Maintenance Window, selected network or server equipment will be worked on, upgraded and restarted. Works will be completed as quickly as possible (and where possible, timing information will be in emails to affected customers) and restarts are short service interruptions only, while upgrades may incur longer service interruptions.

This will incur outages to selected hosting services of Network Presence in Australia during this off-peak scheduled works period.
In addition, there may be some impact (short 5-10 minute periods) to the general Internet Connectivity of portions of Network Presence in Sydney during these works, though redundant routing will be utilised during these works. Our Adelaide POP is unaffected by this Maintenance Notice and works.

Progress updates during the works will be posted to our Operations Twitter Feed at https://twitter.com/netpresops

FYI and regards,
Richard.

Posted in Sales | Comments Off on Data Centre, Network & POP Maintenance Notice – Sat evening & Sunday, March 9th/10th 2019

Marketing & Sales Director position available

Network Presence has a profitable growth program established in the business and we’re ready to scale this through building a Sales and Marketing capability within the business.

We’re looking for someone to join our loose and remote work based team.
You don’t need to be in Adelaide or Sydney where we’re mostly based in Australia, we’re here for you to do what you know to do for us and will support you in all ways possible and needed for you to do that for us.

Equity and Salary is available for a proven performer in the IT/Telco/Cloud Market and please see my LinkedIn post on this opportunity with us here at Network Presence.

Please contact me (Richard) by email via admin AT networkpresence.com.au or on LinkedIn if you’re interested in working with us.

Regards,

Richard.


Posted in Sales | Tagged | Comments Off on Marketing & Sales Director position available

VPS Hosting Platform Upgrades for 2019

This year we’re upgrading a number of our VPS Hosting Nodes in our Sydney and Adelaide POPs. These Upgrades entail new hardware for many customer VPS and at some point in this process VPS will need to be stopped on their old node and started on the new one.

To these ends we’ve got a number of new server platforms online in Sydney and more coming in March, and customers are being migrated to them as requested or required by their usage profiles.

There’s also new servers coming online in our Adelaide POP, along with more network capacity for that location.

Progressively over the months of early to mid 2019, we’ll let customers know when/whether the upgrades affect their VPS at Network Presence.

FYI and enjoy the new, faster, VPS Hosting at Network Presence, regards,
Richard.

Posted in Sales | Tagged , , , | Comments Off on VPS Hosting Platform Upgrades for 2019

Data Centre, Network & POP Maintenance Notice – Wed evening & Thu morning, February 6th/7th 2019

During the evening of Wednesday, February 6th from 9pm that night (through to 6am on Thursday morning) we will be performing upgrades to selected hosting server platforms of Network Presence in Sydney, Australia.

Customers with services (VPS) on the hosting platforms to be upgraded may be emailed advisory notices, and this is a general notice related to other ancillary upgrades and Infrastructure Maintenance being performed during this scheduled window of time.

This Maintenance Window starts from 9pm Sydney time on the evening of Wednesday, February 6th 2018 through to 6am on the Thursday morning, and I’ll be personally contactable by phone & online during and after these works in-case there’s any issues that arise. During this Maintenance Window, selected network or server equipment will be worked on, upgraded and restarted. Works will be completed as quickly as possible (and where possible, timing information will be in emails to affected customers) and restarts are short service interruptions only, while upgrades may incur longer service interruptions.

This will incur outages to selected hosting services of Network Presence in Australia during this off-peak scheduled works period.
In addition, there may be some impact (short 5-10 minute periods) to the general Internet Connectivity of portions of Network Presence in Sydney during these works, though redundant routing will be utilised during these works. Our Adelaide POP is unaffected by this Maintenance Notice and works.

Progress updates during the works will be posted to our Operations Twitter Feed at https://twitter.com/netpresops

FYI and regards,
Richard.

Posted in Sales | Comments Off on Data Centre, Network & POP Maintenance Notice – Wed evening & Thu morning, February 6th/7th 2019

Node 16 & Sydney Router Upgrades

During the evening of Tuesday, November 27th from 9pm that night (through to 7am on Wednesday morning) we will be performing upgrades to the hosting server known as “Node 16” in Sydney, as well as one of our many border routers of Network Presence in Sydney, Australia.

Update: These works went well on the night and during the days afterwards we found a kernel setting that was required for these upgraded Nodes, which was in-place by Monday December 3rd.

Customers with services (VPS) on the affected hosting platform(s) to be upgraded may be emailed advisory notices, and this is a general notice related to other ancillary upgrades and Infrastructure Maintenance being performed during this scheduled window of time, and specifically the short cutovers between routing upgrades that’ll affect a small segment of our Sydney based VPS customers.

This Maintenance Window starts from 9pm Sydney time on the evening of Tuesday, November 27th 2018 through to 6am on the Wednesday morning, and I’ll be personally contactable by phone & online during and after these works in-case there’s any issues that arise. During this Maintenance Window, selected network or server equipment will be worked on, upgraded and restarted. Works will be completed as quickly as possible (and where possible, timing information will be in emails to affected customers) and restarts are short service interruptions only, while upgrades may incur longer service interruptions.

This will incur outages to selected hosting services of Network Presence in Australia during this off-peak scheduled works period.
In addition, there may be some impact (short 5-10 minute periods) to the general Internet Connectivity of portions of Network Presence in Sydney during these works, though redundant routing will be utilised during these works. Our Adelaide POP is unaffected by this Maintenance Notice and works.

Progress updates during the works will be posted to our Operations Twitter Feed at https://twitter.com/netpresops

FYI and regards,
Richard.

Posted in Network Presence | Comments Off on Node 16 & Sydney Router Upgrades